Skip to content
India RFID Store

RFID product videos

See the products working before you buy — demos, setup and calibration guides and complete systems. Every product video links to the product page with its price, so you can add it to your quote list.

Subscribe on YouTube

Latest

RFID printers & label encoding

Identium TagSmith RFID Label Software | Design, encode and print UHF RFID labels on the iT4RL

Fixed & integrated readers

Identium IHZ8 & IHZ16: 8 and 16-Port UHF RFID Readers | up to 30 m, 1,000 tags/s

Handheld & mobile readers

Identium ID-SL15 UHF RFID Sled Reader India | Bluetooth, Android & iOS, up to 15 m range

Handheld & mobile readers (11)

CX1500N, CX-series and Bluetooth pocket readers in real stock counts and searches.

Fixed & integrated readers (10)

IF9A, IHZ4 and IHZ4AI readers for dock doors, conveyors and read points.

Desktop readers & encoding (4)

USB readers for tag encoding, batch writing and keyboard-wedge reading.

RFID gates (2)

Walk-through gate readers detecting tagged items and direction of movement.

RFID printers & label encoding (5)

Printer setup, calibration and printing/encoding RFID labels.

IDP300 RFID Printer Setup: Ribbon Loading, Calibration & Tag Profiles

2 Apr 2026

IDRL200 RFID Printer Calibration

4 Dec 2025

Smart trays, boxes & locks (5)

Smart trays, the AI inventory box and RFID cabinet locks.

Tags & wearables (1)

Special-format tags and wearables.

Active RFID & RTLS (3)

2.4 GHz active tags, BLE and real-time location, including evacuation mustering.

Systems & solutions (10)

Complete systems: asset and file tracking, race timing, events, hospitals, armouries and waste management.

RFID Weapon & Armoury (Kote) Management

28 Sept 2026

Apps & software (3)

Identium apps for handheld readers, desktop readers and NFC phones.

About Identium (1)

Who we are and what we make.

Identium — RFID Manufacturer in India: Readers, Tags & Software

1 Aug 2026

Frequently asked questions

What do the RFID videos cover?
The library covers unboxing and setup of UHF readers, antenna placement and read-zone tuning, tag encoding demonstrations, handheld reader software walkthroughs, printer ribbon and calibration steps, and customer case studies from Indian deployments.
Do you provide installation support after purchase?
Yes. Every Identium reader ships with remote setup support. We help with antenna positioning, power and dwell-time settings, and SDK integration by phone, WhatsApp or screen share at no extra cost.
Can I request a video demo of a specific product?
Yes. If a product you are evaluating is not covered, contact us and we will record a short demo of that exact model showing read range, tag compatibility and software output.
Do the readers come with an SDK?
Yes. Identium UHF readers ship with C#, Java, Android and Linux SDKs plus a Windows demo application, so developers can test reads before writing integration code.
Are the videos useful for evaluating read range?
They show real read distances with named tag models, but read range always depends on tag, surface, antenna gain and environment. For a range figure you can rely on, request samples (₹250 for 1–2 samples including shipping, or collect them from our office) and test them on your own assets.

Your quote list

Saved on this device. No payment is taken online.

Your list is empty. Use “Add to quote” on any product, then send one request for everything.